Case Study
Optimizing Book Production Efficiency with Integra’s Workflow Solutions

A prominent academic publisher specializing in Science, Technology, and Medicine titles sought to dramatically enhance production efficiency to stay competitive. Faced with prolonged production schedules and the imperative to maintain quality, they turned to Integra for innovative workflow solutions.
Read the case study to explore the impactful results achieved:
Reduced first proof delivery time from 10 days to 6 days.
Cutting overall book production time from 180 days to 150 days.
Integrated advanced technology for streamlined typesetting and editing processes.